Planning

We usually do the following work during planning phase.
·Plane Layout and User Requirement Specification(URS) Analysis
·Technical Parameters and Details Guide Confirmation
·Air Cleanliness Zoning and Confirmation
·Bill of Quantity(BOQ) Calculation and Cost Estimation
·Design Contract Confirmation

clean room

Design

We are responsible to provide detailed design drawings for your clean room project based on provided information and final layout. The design drawings will have 4 parts including structure part, HVAC part, electrical part and control part. We will modify design drawings till you are completely satisfied. After your final confirmation about design drawings, we will provide complete material BOQ and quotation.

p (1)
clean room

Structure Part
·Clean room wall and ceiling panel
·Clean room door and window
·Epoxy/PVC/High-raised floor
·Connector profile and hanger

clean room hvac

HVAC Part
·Air handling unit(AHU)
·HEPA filter and return air outlet
·Air duct
·Insulation material

clean room system

Electrical Part
·Clean room light
·Switch and socket
·Wire and cable
·Power distribution box

clean room monitoring

Control Part
·Air cleanliness
·Temperature and relative humidity
·Air flow
·Differential pressure