• page_banner

ISO Class 7 Hospital Clean Room Modular Operation Theatre

Short Description:

Modular operation theatre, also called modular operation room, is one of the important functional areas of the hospital, and its engineering quality directly affects the use of the hospital and the treatment of patients. To improve the engineering quality of hospital clean room, attention must be paid to both design and construction. SCT can provide turnkey solution for different kinds of hospital clean room projects. Lets have a further discussion if you have any inquiry.


Product Detail

Product Tags

Product Description

Hospital clean room is mainly used in modular operation room, ICU, isolation room, etc. Medical clean room is a huge and special industry, especially modular operation room has high requirement on air cleanliness. Modular operation room is the most important part of hospital and it consist of main operation room and auxiliary area. The ideal cleanliness level near operation table is to reach class 100. Usually recommend hepa filtered laminar flow ceiling at least 3*3m at top, so operation table and operator can be covered inside. The patient infection rate in sterile environment can reduce more than 10 times, so it can less or not use antibiotics to avoid damaging human immune system.

Technical Data Sheet

Room Air Change

(Times/h)

Pressure Difference in Adjacent Clean Rooms Temp.   () RH   (%) Illumination(Lux) Noise     (dB)
Special Modular Operation Room / 8 20-25 40-60 350 52
Standard Modular Operation Room 30-36 8 20-25 40-60 350 50
General Modular Operation Room 20-24 5 20-25 35-60 350 50
Quasi Modular Operation Room 12-15 5 20-25 35-60 350 50
Nurse Station 10-13 5 21-27 60 150 60
Clean Corridor 10-13 0-5 21-27 60 150 52
Change Room 8-10 0-5 21-27 60 200 60

Application Cases

modular operation room
hospital clean room
modular operation theatre
medical clean room
hospital project
ICU

FAQ

Q: What cleanliness is in modular operation theatre?

A: It is usually ISO 7 cleanliness required for its surrounding area and ISO 5 cleanliness above operation table.

Q: What content is included in your hospital clean room?

A: There are mainly 4 parts including structure part, HVAC part, eletrical part and control part.

Q: How long will medical clean room take from initial design to final operation?

A: It depends on the work scope and usually it can be finished within one year.

Q: Can you do overseas clean room installation and commissioning?

A: Yes, we can arrange if you require.


  • Previous:
  • Next:

  • Related PRODUCTS